Shortcuts to the text Main Menu Shortcut
Construction Engineering Business Division

Design Headquarters

Provide engineering services for key infrastructure
Design Headquarters

It provides expertise-based services that create high added value in infrastructure design, and creates differentiated design results based on technology and creativity in various areas such as roads, water and sewage, water resources, railroads, landscaping, and urban planning. From the beginning, we present sustainable development directions considering environmental, economic, and feasibility. Maximize the value of your infrastructure assets with customized design solutions that meet your needs.

Major business areas

  • Preliminary feasibility study and feasibility study

    Technical and economic feasibility analysis, including environmental impact assessment, soil survey, and construction method review

  • Basic Design

    Design standards and economic feasibility check, construction scale and design direction setting

  • Detailed Design

    Site investigation, drawing preparation, and construction plan establishment

Representative Project

대심도 빗물배수터널 타당성 조사 및 기본계획(2단계)

Feasibility Study of Rainwater Drainage Tunnel in Deep Island and Basic Plan (Step 2)

  • Client
    Seoul Metropolitan Government
  • Location
    All parts of Seoul
  • Project Period
    2025. 05. 23 ~ 2026. 11. 13
동작구 도로확충 및 도로체계 개선 타당성 조사 및 기본계획 수립

Feasibility Study on Road Expansion and Improvement of Road System in Dongjak-gu and Establishment of Basic Plan

  • Client
    Dongjak-gu
  • Location
    Seodal-ro in Dongjak-gu
  • Project Period
    2025. 06. 02 ~ 2025. 12. 31
계룡시 하수도정비 기본계획 및 물재이용 관리계획 변경

Change of basic plan for sewer maintenance and water reuse management plan in Gyeryong-si

  • Client
    Gyeryong City
  • Location
    All of Gyeryong City
  • Project Period
    2024. 04. 26 ~ 2026. 04. 25
도시계획도로(월천지구~아산탕정택지개발지구) 연결도로 개설 기본설계

A Basic Design of Urban Planning Road (Wolcheon District – Asan Tangjeong Housing Development District)

  • Client
    Asan City
  • Location
    Hoseo-ro~Segyo Central 2-gil
  • Project Period
    2023. 06. 29 ~ 2024. 04. 23
  • Completion Year
    2024
서천군 수도정비기본계획 수립, 물수요관리계획 및 상수도관망기술진단

Basic Plan for Water Maintenance in Seocheon-gun, Water Demand Management Plan, and Waterworks Network Technology Diagnosis

  • Client
    Seocheon County
  • Location
    All of Seocheon County areas
  • Project Period
    2022. 07. 13 ~ 2024. 01. 03
  • Completion Year
    2024
청양공공하수처리시설 증설사업(600톤) 기본 및 실시설계

Basic and Implementation Design of Cheongyang Public Sewage Treatment Facilities (600 tons)

  • Client
    Cheongyang County
  • Location
    129-1 Jeongjwa-ri, Cheongyang-eup
  • Project Period
    2022. 05. 02 ~ 2023. 02. 25
  • Completion Year
    2023
대심도 빗물배수터널 타당성 조사 및 기본계획(2단계)
Feasibility Study of Rainwater Drainage Tunnel in Deep Island and Basic Plan (Step 2)
동작구 도로확충 및 도로체계 개선 타당성 조사 및 기본계획 수립
Feasibility Study on Road Expansion and Improvement of Road System in Dongjak-gu and Establishment of Basic Plan
계룡시 하수도정비 기본계획 및 물재이용 관리계획 변경
Change of basic plan for sewer maintenance and water reuse management plan in Gyeryong-si
도시계획도로(월천지구~아산탕정택지개발지구) 연결도로 개설 기본설계
A Basic Design of Urban Planning Road (Wolcheon District – Asan Tangjeong Housing Development District)
서천군 수도정비기본계획 수립, 물수요관리계획 및 상수도관망기술진단
Basic Plan for Water Maintenance in Seocheon-gun, Water Demand Management Plan, and Waterworks Network Technology Diagnosis
청양공공하수처리시설 증설사업(600톤) 기본 및 실시설계
Basic and Implementation Design of Cheongyang Public Sewage Treatment Facilities (600 tons)

Major Project

Year Project name Client
2025 Service for Establishing Effective Management Measures for Geumto-dong Soro Line 1-31 Sujeong District Office
2025 Yongin City Water Reuse Management Plan (Reestablishment) Service Yongin City Hall
2025 Basic Design of the Track Deck (Structure) for Yongsan International Business District SH
2025 Yongsan International Business District East-West Connection Road Construction (Section 1) Basic and Detailed Design SH
2025 Basic and Detailed Design of the Relocated Road on National Route 24, Hapcheon Pumping Station Korea Hydro & Nuclear Power
2025 Basic and Detailed Design of the Wastewater Pipeline Improvement Project in Anseong Treatment Area Anseong City Hall
2025 2025 Uijeongbu City Protected Area Survey Project Uijeongbu City Hall
2025 Detailed Design Service for Water Supply Facility Renovation at Guam and Hwacheon Districts, Suwon City Korea Rural Community Corporation, Jeonnam Regional Branch Office
2025 Basic Planning Service for the 25-00 Fleet Comprehensive Survival Training Center Naval Fleet Command
2025 Urban Management Plan Decision and Detailed Design for Gomoh Lake Park (Urban Planning Facilities Waterfront Park and Parking Lot) Pocheon City Hall